Approved wall openings
Perimeter cuts for doors, windows, access or services after structural responsibility is established.
Track-mounted wall sawing for approved openings, removal boundaries and building-service work in concrete walls. Send Cutcore the drawings, wall thickness, access and section-removal plan so the team can quote the cutting scope.

Scope factors
The method depends on the structure, cut depth and layout, reinforcement, fixing and access conditions, water and slurry control, support of the cut section and the approved removal sequence.
Common applications
Perimeter cuts for doors, windows, access or services after structural responsibility is established.
Defined straight cuts that separate an approved section from the surrounding structure.
Track-mounted cutting where the surface, fixing area and equipment access are suitable.
Sawing that forms one part of a documented demolition, fit-out or services sequence.
Method and responsibility
Wall sawing should be planned with the completed opening in mind. The track position, cutting sequence, corners, adjacent finishes, reinforcement and access on both sides can affect the practical setup. The resulting section may be heavy and should not be released until support, lifting, exclusion and removal arrangements are in place.
Cutcore can discuss the cutting method, but engineering and project approvals remain with the responsible parties. Work involving load-bearing or integrity-related elements may fall within Queensland demolition requirements, and the project team should confirm licensing, notification, high-risk construction work and safe-work documentation obligations.
Concrete and similar materials can contain crystalline silica. The risk assessment, controls, documentation and work-area arrangements must suit the actual task and material.
Queensland silica-processing requirements · Before You Dig Australia · Queensland demolition guidance
Project pathway
Planning questions
Show dimensions, wall thickness, elevations, structural details, known reinforcement or post-tensioning, nearby services, corner requirements and the intended support and removal sequence.
Some setups may be approached from one side, but access, depth, track fixing, water control and section handling determine what is practical for the specific site.
No. Structural changes should be approved by the responsible engineer, designer, asset owner or project party before the cutting scope is finalised.
Confirm support, lifting, sectioning, removal, loading and disposal in the written quote. These are scope-specific and should not be assumed.
Discuss the scope
The team can review the information and identify what else is needed for a project-specific quote.