Core Drilling Brisbane

Core drilling makes round holes in concrete for plumbing, electrical, drainage and air-conditioning work. Send Cutcore the hole size, depth, location and access details so the team can quote the job.

Core-drilling rig set against a concrete slab
Core-drilling equipment set against a concrete slab.

Scope factors

What to confirm before work

The appropriate equipment and setup depend on the material, reinforcement, required diameter and depth, drilling orientation, access, nearby services and the condition of the surrounding structure.

Common applications

Where core drilling may suit the scope

Plumbing and drainage

Planned penetrations for pipework through floors, walls and other accessible construction elements.

Electrical and data

Openings for conduits, cable pathways and related building-service installations.

Mechanical services

Penetrations associated with air conditioning, ventilation and other mechanical-service layouts.

Project-specific openings

Round penetrations where diameter, depth, angle and surrounding conditions can be defined before work.

Method and site constraints

Plan the opening before selecting the equipment

Core drilling is not a substitute for structural design or service approval. Work affecting structural elements, post-tensioned construction or critical assets should be supported by the appropriate drawings, approvals and responsible project personnel.

Scanning or service locating can support planning, but no scan should be treated as a guarantee that every embedded object has been found. Access, material, depth, congestion and equipment limitations affect what can be interpreted.

Dust, water and surrounding areas

Cutting and drilling silica-containing materials can create respirable crystalline silica. The applicable risk assessment, engineering controls, documentation and work-area controls depend on the material and task.

Review current Queensland silica-processing guidance. For work near underground assets, obtain and review current asset-owner information through Before You Dig Australia where relevant.

Project pathway

From scope to scheduled work

  1. Share the job details.Send the site, drawings or marked-up photos, material, dimensions, access and required timing.
  2. Clarify constraints.Confirm structural responsibility, known services, work-area access, power, water and slurry or core handling.
  3. Agree the scope.Review the proposed inclusions, exclusions, method assumptions, timing and price in writing.
  4. Prepare the site.Complete the applicable approvals, isolations, service checks and site-specific controls before drilling begins.

Core drilling questions

Practical answers before you request a quote

What dimensions should I provide?

Provide the required diameter, depth, quantity and drilling orientation, plus the material and any known reinforcement. Marked-up drawings or clear site photos help explain the location.

Can holes be drilled through a wall or floor?

Core drilling can be discussed for horizontal, vertical, angled or inverted work, but access, support, water control and surrounding conditions determine whether a proposed setup is suitable.

Does scanning remove the risk of hitting a service?

No. Scanning can add useful information, but results are affected by the structure, depth, congestion, access and equipment limitations. Current drawings, service-owner information, site knowledge and appropriate controls still matter.

Who confirms a structural penetration?

The relevant engineer, designer, asset owner or other responsible project party should approve structural changes. Cutcore can discuss the drilling method after the authorised location and scope are established.

Are slurry and drilled cores removed?

Confirm water, slurry, core handling and disposal inclusions in the written quote. The arrangement depends on the method, access, material, site rules and project scope.

Discuss the opening

Send Cutcore the material, dimensions, access and timing

The team can review the details and confirm what further information is needed for a project-specific scope.

Open page section