Slabs and pavements
Defined removal areas where services, edges, access and the handling of broken or cut material are planned.
Concrete demolition and removal for slabs, pavements, approved openings and fit-out work across Brisbane. Share your drawings, access, service information and removal requirements so Cutcore can discuss the scope and provide a quote.

Scope factors
Before a method is selected, the project should establish what is being removed, what must remain, structural responsibility, services and hazardous-material information, access, section weights, exclusion needs and the required disposal outcome.
Common applications
Defined removal areas where services, edges, access and the handling of broken or cut material are planned.
Approved alterations with a documented support, cutting and section-removal sequence.
Selective removal coordinated with existing structure, finishes, services and other trades.
Scopes developed from drawings, site conditions, lawful disposal requirements and assigned responsibilities.
Method and responsibility
The method and sequence should protect the stability of what remains and account for falling or shifting material, plant access, work at height, services, noise, silica, asbestos, exclusion areas and neighbouring operations. Cutting may help define separation lines, but it does not replace engineering, demolition planning or hazardous-material controls.
Queensland requirements vary with the structure and method. Work affecting load-bearing or integrity-related elements can be demolition work; licensing, notification, competent supervision, training and safe work method statement duties may apply. The project team should confirm the applicable obligations and council or asset-owner approvals rather than assuming every removal scope is the same.
Concrete and similar materials can contain crystalline silica. The risk assessment, controls, documentation and work-area arrangements must suit the actual task and material.
Queensland silica-processing requirements · Before You Dig Australia · Queensland demolition guidance
Project pathway
Planning questions
Requirements depend on the structure, element and method. The responsible project parties should check current Queensland licensing, notification and high-risk construction obligations for the actual scope.
Provide the asbestos register, surveys or other relevant building information. Suspected material should not be disturbed until it is assessed and managed under the applicable requirements.
Do not assume so. Confirm who provides structural design, demolition planning, approvals, service information, isolations and any required notifications.
The quote should state breaking or sectioning, loading, transport, recycling or disposal and any access or weight limits. Inclusions vary by project.
Discuss the scope
The team can review the information and identify what else is needed for a project-specific quote.