Specified new bollards
Installation scopes developed from the selected product, fixing or footing detail and approved layout.
Cutcore discusses bollard installation and removal in Brisbane, including associated core drilling, footings, concrete cutting and reinstatement. Send the specified product, quantity, layout, fixing details and site access information to request a project-specific quote. Confirm removal, disposal, reinstatement and trade coordination before booking.

Scope factors
The appropriate method depends on the bollard type and manufacturer detail, slab or footing, reinforcement, underground and embedded services, vehicle or pedestrian environment, power or controls, access and the required finish after removal.
Common applications
Installation scopes developed from the selected product, fixing or footing detail and approved layout.
Removal planned around the current fixing, substrate, nearby services and required reinstatement.
Defined drilling or cutting associated with an approved installation or removal sequence.
Bollard work coordinated with the product supplier, electrical or security trades and responsible site party.
Method and responsibility
Fixed, removable and automatic bollards can require different foundations, fixings, clearances, drainage, conduits, power and control interfaces. The product supplier or designer should define the relevant detail. Cutcore can then discuss the concrete work and site access rather than implying one method suits every bollard.
A bollard installation should not be represented as providing a particular security or impact outcome unless the specified product, design, substrate, installation detail and certification support it. Underground and embedded service information, traffic or pedestrian controls and reinstatement responsibility should be confirmed before work.
Concrete and similar materials can contain crystalline silica. The risk assessment, controls, documentation and work-area arrangements must suit the actual task and material.
Queensland silica-processing requirements · Before You Dig Australia · Queensland demolition guidance
Project pathway
Planning questions
Provide the manufacturer, model, fixing or footing detail, quantity, layout and any electrical, drainage or access-control requirements.
Removal can be discussed after the fixing, substrate, services, access and required reinstatement are understood.
No. Use current drawings, asset information, authorised markings and site knowledge. Scanning may add information but does not guarantee every service is found.
Confirm concrete, paving, patching, disposal and final-finish inclusions in the written quote. They vary with the site and scope.
Discuss the scope
The team can review the information and identify what else is needed for a project-specific quote.
Discuss the specified bollard system
Use the form to describe the concrete work for your specified bollard system. These details help Cutcore assess the scope:
For a Toowoomba enquiry, include the exact urban site address so attendance can be assessed. See the Toowoomba service-area guide.
Email marked drawings and photos to brisbane@cutcore.com.au, or call 0409 391 186 to discuss the scope.
Compare concrete sawing methods or find your area in Brisbane service areas.
Privacy settings