What needs scanning before a concrete cut or core hole?

The short answer

A useful concrete-scanning brief covers the proposed work’s full position, size and depth, together with any separate equipment fixings. For a core hole, the centre mark alone leaves out the cutting ring. For a saw cut, the ends and corners also matter. Tell the operator about access limits and changed layouts so the findings can be assessed against the work that will actually happen.

Blue concrete scanner, pencil and closed navy notebook on a concrete slab

Before arranging concrete scanning, it helps to turn “check this spot” into a clear description of the proposed opening. A circle on the floor, a doorway outline and a row of pipe penetrations each raise different investigation questions.

The brief does not need to prescribe how the operator uses the equipment. It needs to describe what the cutting or drilling will involve, where the work extends and what information the project team needs back.

Show the opening, not just its centre

A centre mark identifies a position. It does not show the outside edge of a hole. A core drill removes a ring of concrete around the cylinder that comes out, so the full diameter needs to be considered against interpreted features.

Take a simple plan-view example: two parallel feature lines are 80 mm apart, and a proposed 100 mm hole is centred halfway between them. The centre sits neatly in the gap, but the opening is wider than that gap and crosses both lines.

The example explains why “the dot is between the marks” is incomplete information. Real findings also need their depth, interpretation and uncertainty considered. Feature marks should not be treated as infinitely thin boundaries, and the required separation must come from the project’s assessment.

Provide the proposed hole diameter before the investigation. If a sleeve or another installation detail changes that diameter, communicate the revised opening rather than relying on the pipe’s nominal size.

Three panels compare a centre mark, a full circular opening and an opening with a separate fixing beside two dark lines
The centre, full opening and separate fixing describe different parts of the job.
  • Left: a centre mark sits between two embedded features, shown as navy lines.
  • Middle: the full opening extends across those features; the centre alone misses the conflict.
  • Right: the main opening and a separate stand fixing each need to be considered.

Include depth and direction

A plan view shows where an opening starts, but concrete has thickness. A shallow fixing and a penetration through the whole slab ask different questions of the investigation. State the intended depth and whether the hole passes all the way through.

An angled hole adds another dimension. Its route moves sideways as it passes through the concrete, so the entry point does not represent its position at every depth. Give the contractor the required direction and exit location where these are defined.

If the thickness or opposite-face position is unknown, identify that gap in the brief. Guessing a value can make an investigation appear to address a depth or route that was never established. Cutcore’s explanation of the core drill’s cutting ring shows how the barrel relates to the finished opening.

Include separate stand fixings

The finished penetration may not be the only place where equipment enters the concrete. Where a drilling stand uses an anchor, that fixing has its own location and depth. An investigation around the large hole cannot simply be assumed to cover a smaller fixing elsewhere.

Discuss the likely setup with the drilling contractor so relevant fixing positions can be included. The contractor selects a suitable attachment method; the buyer should make sure the investigation brief and the eventual setup describe the same job.

This also matters if site access forces the stand to move. A fixing position settled later needs to be checked against the information available for that location.

Show saw ends and corners

For a straight saw cut, provide the line, length and intended depth. For a rectangular opening, show all sides and the required corner finish. A circular blade’s curved profile means the visible surface line and the cut at depth do not have identical end geometry.

That can affect the proposed method at a corner or termination. The cutting contractor needs to resolve how the required depth and finished boundary will be achieved, including any proposed extension beyond the opening. The investigation needs to reflect that agreed work extent.

Asking for one point near a doorway to be scanned leaves the remaining edges unanswered. The same applies to a trench: its width and both sides matter, rather than only its centre line. See why circular blades create a square-corner problem for the geometry behind this distinction.

Explain what the operator can reach

Tell the scanning contractor about walls, columns, fixed equipment, finishes and other obstructions around the proposed work. Access to one small patch does not necessarily allow investigation of the whole opening or its surrounding area.

Also say whether the opposite face is accessible. An upper-floor slab may have a ceiling or occupied room below it; a wall may have cabinetry on its other side. These details help the operator explain the practical investigation limits.

Radar records reflections from changes in material properties, which an operator interprets. Metal and conductive conditions can restrict the information returned, as the Federal Highway Administration’s concrete-radar reference explains. A larger marked area does not, by itself, establish that every feature within its depth has been detected.

Give each opening an identity

A row of similar holes can be difficult to discuss when the drawing, floor marks and report use different descriptions. Give each proposed opening a simple identifier and keep it consistent through the handover.

For example, a layout could identify three penetrations as A, B and C, each with its own diameter and location. If B moves, the team can identify the changed item without assuming that findings for A or C settle the new position.

For repeated openings, ask how the agreed findings will be linked to the layout and how access limits or unresolved areas will be recorded. Similar appearance does not establish identical concealed conditions at each location.

Confirm changes before cutting

Moving an opening, enlarging it, changing its angle or altering a fixing position changes the work being assessed. Give the updated layout to the relevant project parties before intrusive work proceeds.

Scanning supplies interpreted information; it does not decide which reinforcement may be interrupted or whether a service can be crossed. Structural assessment, service identification and any isolation or authorisation arrangements remain separate parts of the project.

SafeWork NSW’s concrete-cutting guidance includes clearly marked drill areas and scanning for electrical cables and service assets among its core-drilling controls. A clear final layout helps connect the investigation to the instructions the crew receives.

Cutcore provides concrete scanning for planned cutting, coring and fixings. Get in touch with your proposed layout and available drawings to discuss the work.