Scanning a slab and drilling a hole are connected jobs, but they answer different questions. The scan helps investigate what may be embedded in the concrete. Coring removes material at an agreed location. A contractor needs to explain how the findings from one stage reach the people responsible for the next.
When discussing Cutcore’s concrete scanning service, start with the proposed opening and what you need to learn about its surroundings. The following questions help you assess a contractor’s approach before you book.
Check relevant experience
Relevant experience is more useful than a long list of unrelated projects. Ask about work involving a similar structure, access arrangement and opening. A penetration through a suspended floor raises different handling questions from a short hole in an accessible wall.
Request an example of how the contractor dealt with an uncertain scan result or a proposed hole that could not proceed as drawn. A useful answer explains what was checked, who made the decision and how the revised location was recorded. It does not need to disclose another customer’s confidential plans.
Check who will actually attend and who will interpret the findings. If scanning and drilling are carried out by different people, ask how the report and markings will be handed over. A recognisable business name alone does not explain that handover.
Understand the scan
Ground-penetrating radar sends electromagnetic signals into the material and records returning responses. Changes within the concrete can produce reflections. The operator interprets these responses; the screen is not a photograph of everything beneath the surface.
The US Federal Highway Administration’s explanation of concrete radar describes how material properties, reinforcement and signal attenuation affect the result. A strong response near the surface can make deeper features harder to interpret.
Ask the contractor which method suits your question, what area can be reached and what could remain uncertain. A credible answer should connect the method to the structure and target, rather than promise that one instrument finds every object.
Cutcore’s explanation of why one target can hide another in a radar scan shows why an apparently simple result may still need careful interpretation.
Separate findings from approval
Ask what you will receive: surface markings, a marked drawing, a written report or an agreed combination. The findings need enough context to identify the inspected area, relevant depths, limitations and proposed opening. A coloured line without an explanation can be misunderstood by the next person on site.
Scanning and structural approval are different responsibilities. A scan may indicate reinforcing steel; it does not decide whether that steel can be cut. The responsible engineer, designer or asset owner needs to address the proposed alteration where their approval is required.

- Investigate: the scan provides interpreted information about the accessible area.
- Assess: the responsible project parties consider the findings against the proposed opening and required approvals.
- Drill: the contractor carries out the agreed opening using the confirmed method and handling arrangements.
Ask who checks that the drilling location matches the approved layout on the day. If the opening moves or grows, the original investigation may no longer cover it. The contractor should explain how a changed instruction returns for assessment before drilling continues.
Consider the whole hole
A cross on the floor identifies a point. A core hole occupies a circle and extends through a depth of material. Ask how the full diameter, drilling direction and path will be considered against the available information.
A hollow diamond barrel cuts a ring around a solid core. Its cutting edge reaches beyond the centre mark, while the barrel travels into the structure. Our article on how a core drill cuts a ring explains that geometry.
For example, enlarging a proposed hole changes the material the barrel meets even if the centre stays still. Moving a hole to avoid one indicated feature can bring it closer to another. Those changes need assessment of the complete opening, rather than an informal adjustment to a chalk mark.
Plan setup and core removal
The hole is only part of the physical job. A drill needs a suitable working position and secure setup. Depending on the equipment and location, fixing or positioning it can introduce additional points that need investigation and agreement.
Ask what space is needed, how the equipment reaches it and whether the other side of the structure can be accessed. Drilling through a wall, working overhead and drilling down through a suspended slab involve different surrounding areas and handling arrangements.
The concrete cylinder also has to go somewhere. As the cutting ring reaches the far face, the remaining material holding the core changes. The contractor needs to plan its control and removal, including protection of people, finishes and equipment below or behind the opening.
A clear answer describes the proposed arrangement for your site. It should not leave core handling or access to the far side as a surprise after the drill arrives.
Include controls and cleanup
Concrete drilling can create respirable crystalline silica. WorkSafe Queensland’s silica-processing guidance explains that processing must be controlled and that businesses must assess whether it is high risk. Ask how the contractor’s proposed controls and documentation apply to the actual task.
Wet drilling brings a separate practical question: where will the water and cut material be collected? Water mixed with fine concrete particles becomes slurry. In an occupied building, its path can matter as much as the position of the drill.
Ask whether the proposal includes collection, protection of adjacent areas, removal of the core and cleanup. Clarify the handover condition for the next trade. An allowance for making a hole may cover less work than an allowance for leaving the area ready for installation.
Compare written answers
Give each contractor the same hole sizes, quantities, drawings and access information. Then compare the investigation area, deliverables, drilling assumptions and handling arrangements. If one proposal excludes scanning or access to the far side, that difference needs to be understood before the totals are compared.
Confirm the business details and relevant insurance, and ask what evidence of competency applies to the people and work involved. Avoid treating an impressive equipment list or an unexplained certificate as a substitute for a clear method and allocation of responsibility.
The strongest discussion ends with a defined opening, an understood investigation and a clear answer about what happens if the findings change the plan. That gives you something practical to assess alongside price and timing.
Discuss scanning and coring for your project
Cutcore provides concrete scanning and core drilling in Brisbane. Send the site address, proposed hole locations and sizes, available drawings and access photos. Say whether you need scanning, drilling or both, and flag anything still unknown.